![Petition for truing-up of tariff of National Capital Thermal Power Station Dadri, Stage-I (840 MW) NTPC Limited – EQ Mag](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for truing-up of tariff of National Capital Thermal Power Station Dadri, Stage-I (840 MW) NTPC Limited – EQ Mag
0
0
Petition for truing-up of tariff of National Capital Thermal Power Station Dadri, Stage-I (840 MW) NTPC Limited
For more information please see below link:
Related posts:
- Petition for seeking truing up of tariff for the 2014-19 Tariff Period in respect of Kahalgaon STPS Stage-I (840 MW) – EQ Mag Pro
- Petition for adoption of transmission charges with respect to ISTS being established by Khavda Bhuj Transmission Limited. Khavda-Bhuj Transmission Limited – EQ Mag Pro
- Petition for approval of tariff of Doyang Hydroelectric Project (75 MW) of NEEPCO Ltd – EQ Mag Pro
- Petition for seeking compensation against additional cost incurred on account of implementation of the Goods and Service Tax Law as “Change in Law Event – EQ Mag