![Petition for truing-up of tariff of Ramagundam STPS, Stages-I&II (2100 MW) for the period 2014-19. NTPC Limited – EQ Mag](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for truing-up of tariff of Ramagundam STPS, Stages-I&II (2100 MW) for the period 2014-19. NTPC Limited – EQ Mag
0
0
Petition for truing-up of tariff of Ramagundam STPS, Stages-I&II (2100 MW) for the period 2014-19. NTPC Limited
For more information please see below link:
Related posts:
- Petition for truing-up of tariff of National Capital Thermal Power Station Stage-II (980 MW) NTPC Limited – EQ Mag Pro
- Petition for approval of tariff of the Feroze Gandhi Unchahar Thermal Power Station Stage-3 (210 MW) NTPC Limited – EQ Mag Pro
- Petition for approval of tariff of Darlipali Super Thermal Power Station Stage-I (2×800 MW) for the period from COD of Unit-I (i.e. 1.3.2020) to 31.3.2024 – NTPC Limited – EQ Mag
- Petition for determination of tariff of Talcher Thermal Power Station (460MW) NTPC Limited – EQ Mag