Petition for Adoption of Tariff discovered through Competitive Bidding Process for selection of solar power developers for setting up of 500 MW ISTS-connected Solar PV Power projects in India
0
0
Petition for Adoption of Tariff discovered through Competitive Bidding Process for selection of solar power developers for setting up of 500 MW ISTS-connected Solar PV Power projects in India.
For more information please see below link:
Related posts:
- Petition for approval of tariff of Feroze Gandhi Unchahar Thermal Power Station Stage-IV (500 MW) for the 2019-24 tariff period NTPC Limited – EQ Mag Pro
- Petition for revision of tariff for the 2014-19 tariff period after truing up exercise in respect of Bokaro Thermal Power Station Unit-1 to 3 (630 MW) and determination of tariff for the 2019-24 tariff period – EQ Mag
- Petition for revision of tariff of Vindhyachal Super Thermal Power Station Stage-V (500 MW) NTPC Limited – EQ Mag
- Petition for determination of tariff on installation of various Emission Control Systems in MTPS (1000 MW) of DVC – EQ