Petition for determination of tariff of Rihand Super Thermal Power Station Stage-I (1000 MW) for the period 2019-24. NTPC Limited – EQ
0
0
Petition for determination of tariff of Rihand Super Thermal Power Station Stage-I (1000 MW) for the period 2019-24. NTPC Limited
For more information please see below link:
Related posts:
- Petition for approval of tariff of Korba STPS Stage-I & Stage-II (2100 MW) for the period from 1.4.2019 to 31.3.2024. NTPC Limited – EQ Mag Pro
- Petition for revision of tariff of Loktak Hydroelectric Power Station (105 MW) NTPC Limited – EQ Mag Pro
- Petition for Adoption of Tariff discovered through Competitive Bidding Process for procurement of power from the 1200 MW Grid-Connected Solar PV Power Project at Village- Kalijal – EQ Mag