SECI: Postponement of pre-bid meeting to 08.12.2015 for 440 MW Solar PV Projects in UP Solar Park
80
0
This has reference to the RfS documents issued by SECI for setting up of 440 MW grid connected solar PV projects in the state of UP vide RfS No. SECI/JNNSM/P-2/B-3/RfS/UP/092015 dated 24.09.2015 under JNNSM Ph-II Batch –III Tranche-III.The pre-bid meeting for the subject RfS document is postponed to 08.12.2015 (14:30 Hrs.). The last date of Bid submission is 17.12.2015 (14:00 Hrs.)
Prospective bidders are requested to remain updated from the TCIL website (www.tcil-india-electronictender.com).
Tender Search code: SECI-2015-TN000006
Related posts:
- Civil and Structural Job for 1MW Solar Power System (Phase_1)
- Provn of solar LED lighting luminaries in water supply installation and certain E/M spl repair work at Old Cantt Allahabad.
- SUPPLY AND FIXING OF 10 SOLAR HIGHMAST LIGHT 18W AT DISTT. BARABANKI
- Installation of Arcenic Free Solar Water Plant (Pump) at Chapra Pan. Samity Compound