![Petition for adoption of tariff of 600 MW Wind Power Projects (Tranche XIII) connected to the inter-State Transmission System (ISTS) and selected through Competitive Bidding Process – EQ](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for adoption of tariff of 600 MW Wind Power Projects (Tranche XIII) connected to the inter-State Transmission System (ISTS) and selected through Competitive Bidding Process – EQ
0
0
Petition for adoption of tariff of 600 MW Wind Power Projects (Tranche XIII) connected to the inter-State Transmission System (ISTS) and selected through Competitive Bidding Process.
For more information please see below link:
Related posts:
- Petition for approval of tariff of Kameng Hydroelectric Power Plant (KaHEP) (600 MW) NEEPCO – EQ Mag
- Petition for approval of tariff of Kameng Hydroelectric Power Plant (KaHEP) (600 MW) – EQ Mag
- Petition for adoption of tariff for 600 MW Solar Power Projects (Tranche VIII) connected to the Inter-State Transmission System (ISTS) – EQ
- Petition for adoption of tariff for 600 MW Solar Power Projects (Tranche VIII) connected to the Inter-State Transmission System (ISTS) ) and selected through competitive bidding process – EQ