Petition for seeking permission to allow drawal of start-up power and injection of infirm power to the grid for Unit-2 (800 MW) of Telangana Ph-I (2X800 MW) – EQ
0
0
Petition for seeking permission to allow drawal of start-up power and injection of infirm power to the grid for Unit-2 (800 MW) of Telangana Ph-I (2X800 MW)
For more information please see below link:
Related posts:
- Petition for approval of tariff of the Rihand Super Thermal Power Station-II (1000 MW) for the period from 1.4.2019 to 31.3.2024.NTPC Limited – EQ Mag Pro
- Petition for approval of tariff of Darlipali Super Thermal Power Station Stage-I (2×800 MW) for the period from COD of Unit-I (i.e. 1.3.2020) to 31.3.2024 – NTPC Limited – EQ Mag
- Petition approval of tariff of Singrauli Super Thermal Power Station (2000 MW) for the period 1.4.2019 to 31.3.2024. NTPC Limited – EQ Mag
- Petition for truing-up of tariff of Ramagundam STPS, Stages-I&II (2100 MW) for the period 2014-19. NTPC Limited – EQ Mag