Petition for revision of tariff of Kahalgaon Super Thermal Power Station for the period from 1.4.2014 to 31.3.2019 after the truing up exercise. NTPC Limited – EQ
0
0
Petition for revision of tariff of Kahalgaon Super Thermal Power Station for the period from 1.4.2014 to 31.3.2019 after the truing up exercise. NTPC Limited
For more information please see below link:
Related posts:
- Petition for approval of tariff of the Rihand Super Thermal Power Station-II (1000 MW) for the period from 1.4.2019 to 31.3.2024.NTPC Limited – EQ Mag Pro
- Petition for revision of tariff of Faridabad Gas Power Station (431.586 MW) NTPC Limited – EQ Mag
- Petition approval of tariff of Singrauli Super Thermal Power Station (2000 MW) for the period 1.4.2019 to 31.3.2024. NTPC Limited – EQ Mag
- Petition for truing-up of tariff of Ramagundam STPS, Stages-I&II (2100 MW) for the period 2014-19. NTPC Limited – EQ Mag