![Petition for determination of generation tariff for the period 1.4.2019 to 31.3.2024 and truing-up of generation tariff from 1.4.2014 to 31.3.2019 in respect of 262.5 MW – EQ](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for determination of generation tariff for the period 1.4.2019 to 31.3.2024 and truing-up of generation tariff from 1.4.2014 to 31.3.2019 in respect of 262.5 MW – EQ
0
0
Petition for determination of generation tariff for the period 1.4.2019 to 31.3.2024 and truing-up of generation tariff from 1.4.2014 to 31.3.2019 in respect of 262.5 MW
For more information please see below link:
Related posts:
- Petition Is Allowed For Compensation on Account of Imposition of Safeguard Duty For Import of Solar Cells Order in Review Petition – EQ Mag Pro
- Petition with respect to grant of transmission license to Kishtwar Transmission Limited – EQ Mag
- Petition of PPA executed between the VEVPL with SECI inter alia, seeking declaratory relief/ in-principle approval of Change in Law events prayed by the VEVPL – EQ Mag
- Petition for approval of tariff of Singrauli Super Thermal Power Station (2000 MW) for the period 2019-24. NTPC Limited – EQ