Public hearing on Draft Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (Second Amendment) Regulations, 2024 – EQ
0
0
Public hearing on Draft Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (Second Amendment) Regulations, 2024
For more information please see below link:
Related posts:
- Draft Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (First Amendment) Regulations, 2023 – EQ Mag
- CERC (Connectivity and General Network Access to the inter-State Transmission System) (First Amendment) Regulations, 2023 – EQ Mag
- Determination of Fee and Charges Payable of the CERC (T&C for Recognition and Issuance of REC for RE Generation) Regulations, 2010.
- Determination of levellised generic tariff for FY 2022-23 under Regulation 8 of the CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020 – EQ Mag Pro
tags:
CERC Connectivity and General Network Access to the inter-State Transmission System REGULATIONS