![Petition for revision of tariff of Muzaffarpur Thermal Power Station Stage-I (220 MW) after the truing up exercise for the period from 1.4.2014 to 31.3.2019 KBUNL – EQ](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for revision of tariff of Muzaffarpur Thermal Power Station Stage-I (220 MW) after the truing up exercise for the period from 1.4.2014 to 31.3.2019 KBUNL – EQ
0
0
Petition for revision of tariff of Muzaffarpur Thermal Power Station Stage-I (220 MW) after the truing up exercise for the period from 1.4.2014 to 31.3.2019 KBUNL
For more information please see below link:
Related posts:
- Petition for revision of tariff for the 2014-19 tariff period and determination of tariff for the 2019-24 tariff period in respect of Dulhasti Power Station (390 MW). NHPC Limited – EQ Mag Pro
- Petition for revision of tariff of Sipat Super Thermal Power Station Stage-II (1000 MW) NTPC Limited – EQ Mag Pro
- Petition for revision of tariff of Mauda Super Thermal Power Station-I (1000 MW) NTPC – EQ Mag Pro
- Petition for revision of tariff of Muzaffarpur Thermal Power Station Stage-I (220 MW) – EQ Mag