![Petition for determination of tariff of Talcher Thermal Power Station (460MW) for the period from 1.4.2019 to 31.3.2024 NTPC – EQ](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for determination of tariff of Talcher Thermal Power Station (460MW) for the period from 1.4.2019 to 31.3.2024 NTPC – EQ
0
0
Petition for determination of tariff of Talcher Thermal Power Station (460MW) for the period from 1.4.2019 to 31.3.2024 NTPC
For more information please see below link:
Related posts:
- Petition for revision of tariff of Simhadri Super Thermal Power Station, Stage-II (1000 MW) for the 2014-19 tariff period – EQ Mag Pro
- Petition for revision of tariff of Talcher Super Thermal Power Station, Stage-II (2000 MW) – EQ Mag Pro
- Petition for approval of tariff of Lara Super Thermal Station (1600 MW) NTPC Limited – EQ Mag
- Petition of PPA executed by the RSEKPL and NTPC Limited, seeking relief on account of Changes in Law increasing the rate of Goods and Services Tax – EQ Mag