![Petition for Adoption of Tariff of 690 MW Wind Power Projects (Tranche XIV) connected to the Inter-State Transmission System and selected through Competitive Bidding Process – EQ](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for Adoption of Tariff of 690 MW Wind Power Projects (Tranche XIV) connected to the Inter-State Transmission System and selected through Competitive Bidding Process – EQ
0
0
Petition for Adoption of Tariff of 690 MW Wind Power Projects (Tranche XIV) connected to the Inter-State Transmission System and selected through Competitive Bidding Process
For more information please see below link:
Related posts:
- Petition for adoption of tariff for the 970 MW Wind Power Projects connected to the Inter-State Transmission System (ISTS) – EQ Mag Pro
- Petition of tariff for 970 MW Wind Power Projects (Tranche-IX) connected through inter-State Transmission System – EQ Mag Pro
- Petition for adoption of tariff for Wind Power Projects (Tranche – XII) connected to the ISTS and selected through competitive bidding process as per the guidelines of the Government of India – EQ
- Petition for adoption of tariff for the Wind Power Projects (Tranche-XI) connected to the ISTS and selected through competitive bidding process as per the guidelines of the Government of India – EQ