Petition for Adoption of Tariff for procurement of 1200 MW power from ISTS-Connected Solar PV Power Projects in India – EQ
0
0
Petition for Adoption of Tariff for procurement of 1200 MW power from ISTS-Connected Solar PV Power Projects in India
For more information please see below link:
Related posts:
- Petition For Adoption of Tariff For Inter-State Transmission System Connected 1200 MW, ISTS connected Solar PV Power Projects Under Open Category – EQ Mag Pro
- Petition for determination of transmission tariff from COD in respect of two number of assets under “Transmission System associated with DGEN (1200 MW) of Torrent Power Limited” – EQ Mag Pro
- Petition for adoption of tariff for 550 MW grid connected solar PV power projects selected through competitive bidding process – EQ Mag Pro
- Petition for adoption of tariff for 1200 MW Wind-Solar Hybrid Power Projects (Tranche-IV) connected to the ISTS and selected through competitive bidding process as per the guidelines of the GOI – EQ Mag