![Petition for adoption of tariff for the cumulative capacity of 18 MW Ground Mounted Solar Photo Voltaic (PV) Project connected to BBMB inter-state transmission system – EQ](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for adoption of tariff for the cumulative capacity of 18 MW Ground Mounted Solar Photo Voltaic (PV) Project connected to BBMB inter-state transmission system – EQ
0
0
Petition for adoption of tariff for the cumulative capacity of 18 MW Ground Mounted Solar Photo Voltaic (PV) Project connected to BBMB inter-state transmission system
For more information please see below link:
Related posts:
- Petition of the PPA executed between Rattan India Solar 2 and SECI for seeking approval of Change in Law events due to enactment of the GST Laws – EQ Mag Pro
- Petition for seeking approval for creation of security interest over the Lakadia Banaskantha Transco Limited Assets in favour of the Respondent – EQ Mag
- Petition with respect to grant of transmission license to Kishtwar Transmission Limited – EQ Mag
- Petition for adoption of tariff for 1170 MW Wind-Solar Hybrid Power Projects (Tranche V) connected to Inter-State Transmission System – EQ Mag