![Commission passed order filed by M/s.Polepally Solar Parks Private Limited against TSSPDCL – EQ](https://www.eqmagpro.com/wp-content/uploads/2020/07/TSERC-Commission-invites-comments-in-the-matter-of-Suo-Moto-determination-of-variable-cost-for-existing-biomass-bagasse-and-industrial-waste-based-power-projects-in-Telangana.jpg)
Commission passed order filed by M/s.Polepally Solar Parks Private Limited against TSSPDCL – EQ
0
0
Commission passed order filed by M/s.Polepally Solar Parks Private Limited against TSSPDCL
For more information please see below link:
Related posts:
- Commission issues (NET METERING ROOFTOP SOLAR PV GRID INTERACTIVE SYSTEMS) FIRST AMENDMENT REGULATION, 2020
- The Co-operative Electric Supply Society Limited, Sircilla (petitioner) has filed the above petitions for determination of ARR and ERC for FYs 2019-20, 2020-21 and 2021-22 – EQ Mag Pro
- Retail Supply Tariff Schedule for FY 2022-23
- Commission invites comments and suggestions in the matter of passing consequential order as per the Hon’ble Appellate Tribunal for Electricity (APTEL) order – EQ Mag