![Petition for adoption of usage charges for 1000 MW Solar Photovoltaic (PV) Power Station connected to the Inter-State Transmission System and selected through competitive bidding process – EQ](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for adoption of usage charges for 1000 MW Solar Photovoltaic (PV) Power Station connected to the Inter-State Transmission System and selected through competitive bidding process – EQ
0
0
Petition for adoption of usage charges for 1000 MW Solar Photovoltaic (PV) Power Station connected to the Inter-State Transmission System and selected through competitive bidding process.
For more information please see below link:
Related posts:
- Petition for approval of tariff of the Rihand Super Thermal Power Station-II (1000 MW) for the period from 1.4.2019 to 31.3.2024.NTPC Limited – EQ Mag Pro
- Petition for approval of tariff of Nabinagar Thermal Power Project (1000 MW) for the period from anticipated Date of Commercial Operation of Unit-1 – EQ Mag Pro
- Petition for revision of tariff of Mauda Super Thermal Power Station-I (1000 MW) NTPC – EQ Mag Pro
- Petition for truing up of tariff of Indira Gandhi Super Thermal Power Project, Stage- I (1500 MW) Aravalli Power Company Private Limited – EQ Mag Pro