Petition for adoption of tariff for 1200 MW Wind Solar Hybrid Power Projects (Tranche-VIII) connected to the Inter-State Transmission System (ISTS) and selected through competitive bidding process – EQ
0
0
Petition for adoption of tariff for 1200 MW Wind Solar Hybrid Power Projects (Tranche-VIII) connected to the Inter-State Transmission System (ISTS) and selected through competitive bidding process
For more information please see below link:
Related posts:
- Petition For Determination of Tariff of 1200 MW Coal Based Power Project at Odisha
- Petition For Adoption of Tariff For Inter-State Transmission System Connected 1200 MW
- Petition for determination of transmission tariff from COD in respect of two number of assets under “Transmission System associated with DGEN (1200 MW) of Torrent Power Limited” – EQ Mag Pro
- Petition for adoption of tariff for 1200 MW Wind-Solar Hybrid Power Projects (Tranche-IV) connected to the ISTS and selected through competitive bidding process as per the guidelines of the GOI – EQ Mag