Petition of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for establishment of Transmission Line Stores of Sikkim Power Transmission Limited (formerly Teestavalley Power Transmission Limited) – EQ
0
0
Petition of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for establishment of Transmission Line Stores of Sikkim Power Transmission Limited (formerly Teestavalley Power Transmission Limited)
For more information please see below link:
Related posts:
- Petition of the CERC (Conduct of Business) Regulations 1999 of Mine-II Expansion – EQ
- Petition of the CERC General Network Access quantum of 600 MW and (Connectivity and General Network Access to the Inter-State Transmission System) and(Conduct of Business) Regulations – EQ
- Petition of the CERC (Conduct of Business) Regulations, 2023 passed by the Commission – EQ
- Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2024 – EQ