Petition of the Electricity Act of the CERC (Connectivity and General Network Access to the inter- State Transmission System) and (Grant of Connectivity, Long- Term Access and Medium-term Open Access in Inter-State Transmission and Related Matters) – EQ
0
0
Petition of the Electricity Act of the CERC (Connectivity and General Network Access to the inter- State Transmission System) and (Grant of Connectivity, Long- Term Access and Medium-term Open Access in Inter-State Transmission and Related Matters)
For more information please see below link:
Related posts:
- CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022 – EQ Mag Pro
- Petition for adoption of tariff for 2000 MW Solar Power Projects (Tranche-IX) connected to Inter-State Transmission System and selected through competitive bidding process – EQ Mag Pro
- Petition for adoption of tariff for 1200 MW Wind Power Projects (Tranche – X) connected to the Inter-State Transmission System – EQ Mag Pro
- Petition for seeking amendment and transfer of Petitioner’s Inter-State Transmission Licence – EQ