Petition for Adoption of tariff of 1000 MW Wind-Solar Hybrid Power Projects connected to the inter-State Transmission System – EQ
0
0
Petition for Adoption of tariff of 1000 MW Wind-Solar Hybrid Power Projects connected to the inter-State Transmission System
For more information please see below link:
Related posts:
- Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (First Amendment) Regulations – EQ Mag
- Petition for Adoption of transmission charges with respect to the transmission system to be implemented by Khavda IV C Power Transmission Limited – EQ
- Petition for Adoption of CERC (Procedure, Terms and Conditions for Grant of Transmission Licence and other related matters) Regulations to grant of Transmission Licence – EQ
- Petition for Adoption of Tariff Process for Setting up of 1200 MW ISTS-connected Solar PV Power Projects – EQ
tags:
ADOPTION CERC hybrid power projects inter state transmission system REGULATIONS tariff of 1000 MW Wind-solar