
Petition for Adoption of Tariff 1200 MW Firm & Despatchable Power with “Greenshoe Option” from ISTS connected RE Power Projects coupled with Energy Storage System – EQ
0
0
Petition for Adoption of Tariff 1200 MW Firm & Despatchable Power with “Greenshoe Option” from ISTS connected RE Power Projects coupled with Energy Storage System
For more information please see below link:
Related posts:
- Petition for Adoption of Tariff Process for Setting up of 1200 MW ISTS-connected Solar PV Power Projects – EQ
- Petition for Adoption of Transmission Charges with respect to the Transmission System for the Jam Khambhaliya Transmission Limited – EQ
- Petition for Adoption of Transmission Charges to the Transmission System being established by the Khavda PS1 and 3 Transmission Limited – EQ
- Petition for Adoption of Tariff for the ISTS Grid connected 1400 MW Renewable Energy Power Projects coupled with Energy Storage System – EQ
tags:
1200 MW ADOPTION CERC Firm & Despatchable Power GREENSHOE OPTION ISTS-CONNECTED RE power projects REGULATIONS