1. Home
  2. Tenders
  3. MNRE: Guideline For selection of 3000MW Grid-Connected Solar PV Power Projects under NSM, Phase-II, Batch-II, Tranche-I,”State Specific Building Scheme”-Modification, reg.

MNRE: Guideline For selection of 3000MW Grid-Connected Solar PV Power Projects under NSM, Phase-II, Batch-II, Tranche-I,”State Specific Building Scheme”-Modification, reg.

227
0

The Undersigned is directed to refer to the Guidlines for selection of 3000MW Gris-connected Solar PV Power Projects under NSM. Phase-II,Batch-II, Tranche-I, “State Specific Building Scheme”-and to state that Section 3.9/(ii) thereof stands modified as follows:

For more information pls go through attached PDF….. Amendments-3000-MW-Tranche-1-Guidelines-State-Specific-Bundling-Scheme
Anand Gupta Editor - EQ Int'l Media Network

LEAVE YOUR COMMENT

Your email address will not be published. Required fields are marked *