Design Manufacture Supply Erection Testing Commissioning with Operation Maintenance for 10 years for aggregate capacity of 1250kWp Grid Connected Rooftop SPV Solar Power Plant with High Power Evacuation on HT Side Water Works Sector 32 Chandigarh
57
0
Design Manufacture Supply Erection Testing Commissioning with Operation Maintenance for 10 years for aggregate capacity of 1250kWp Grid Connected Rooftop SPV Solar Power Plant with High Power Evacuation on HT Side Water Works Sector 32 Chandigarh
For more information please see below link…
Related posts:
- Procurement of store for repair and maintenance of solar light and 12 volt secondery batteries ( against BER) for solar light in BOPs of 63 BN BSF under SHQ BSF Barmer (Raj)
- Installation of solar pump system mini PWSS on open well at Kayri, Tal-Jawhar, Dist-Palghar
- Supply, fixing, testing and commissioning of 500Wp Mini Solar Power System
- SITC of 11 nos. solar water heating system at IISER Bhopal