![Supply installation and commissioning of Solar Photovoltaic Power Generation Plant with Battery back up followed by 5 years comprehensive maintenance in the district of Coochbehar](https://www.eqmagpro.com/wp-content/uploads/2018/05/Supply-installation-and-commissioning-of-Solar-Photovoltaic-Power-Generation-Plant-with-Battery-back-up-followed-by-5-years-comprehensive-maintenance-in-the-district-of-Coochbehar.jpg)
Supply installation and commissioning of Solar Photovoltaic Power Generation Plant with Battery back up followed by 5 years comprehensive maintenance in the district of Coochbehar
55
0
Supply installation and commissioning of Solar Photovoltaic Power Generation Plant with Battery back up followed by 5 years comprehensive maintenance in the district of Coochbehar under DEEN DAYAL UPADHYAY GRAM JYOTI YOJANA DDUGJY Scheme
For more information please see below link:
Related posts:
- Installation of solar light at Grampanchayat Kainad Tal Dahanu Dist Palghar – 2
- Request For Proposal (RFP) is invited from the Power Producing Companies/ Solar Developers for the allotment of 150 MWAC (50 MWAC x3 Blocks) Grid-Connected Ground Mounted Solar Photovoltaic Projects to be implemented in Pavagada Solar Park in the state of Karnataka
- Solar power pack installed in Grampanchayat office At Tirwandi Tal Malshiras
- PROVISION OF SOLAR WATER HEATER WITH CONNECTED PLUMBING WORKS AT NAVAL HOSPITAL AND SPECIAL REPAIR TO UNSERVICIABLE ELECTRICALS FITTINGS AND CONNECTED WORK AT NCHC POWAI UNDER GE (NW) BHANDUP, MUMBAI