1. Home
  2. Renewable Energy
  3. Achieves generation yield of 7.66 million Kwh over the last 12 months post commissioning in Kutch, Gujarat
Achieves generation yield of  7.66 million Kwh over the last 12 months post commissioning in Kutch, Gujarat

Achieves generation yield of 7.66 million Kwh over the last 12 months post commissioning in Kutch, Gujarat

14
0

J.P. Chalasani, Group CEO, Suzlon Group said “The S111 120m 2.1MW wind turbine is a game changer in the industry. It has been our continuous effort to reduce the levelised cost of energy (LCoE) and we continue to invest in R&D with an aim to develop technologically advanced and innovative products. It is a proud moment for us to witness the prototype of S111 120m 2.1 MW turbine deliver ~42% PLF. It has successfully generated yield of 7.66 million Kwh over the last 12 months. With its reduced levelised cost of energy (LCoE), cost effective design and superior performance S111 120m will unlock unviable sites and set new benchmarks in the Indian wind industry”

Duncan Koerbel, Chief Technology Officer (CTO), Suzlon Energy, said “We are very pleased with the performance of our new wind turbine model S111 120m. By delivering ~42% PLF, the turbine performance has validated our design goals. Our focus is on developing efficient turbines to make previously unviable sites viable. The world needs more and more renewable energy systems and Suzlon’s technology will continue to play a crucial role in powering a greener tomorrow.”

Anand Gupta Editor - EQ Int'l Media Network

LEAVE YOUR COMMENT

Your email address will not be published. Required fields are marked *