1. Home
  2. India
  3. Adani Green Energy commissions 180 MW solar power project at Jaisalmer -EQ
Adani Green Energy commissions 180 MW solar power project at Jaisalmer -EQ

Adani Green Energy commissions 180 MW solar power project at Jaisalmer -EQ

0
0

In Short : Adani Green Energy has operationalized a 180 MW solar power project in Jaisalmer, adding to its renewable energy portfolio and contributing to sustainable power generation in the region.

In Detail : Adani Solar Energy RJ Two, wholly-owned stepdown subsidiary of Adani Green Energy (AGEL) has operationalized 180 MW of solar power project at Devikot in Jaisalmer, Rajasthan.

With operationalization of this plant, AGEL’s total operational renewable generation capacity has increased to 9,784 MW, in its journey of 45 GW capacity by 2030.

Based on the relevant clearances, it was decided at 1.28 a.m. on 27 March 2024 to operationalize the plant and commence power generation from 27 March 2024.With the successful commissioning of this plant, AGEL’s operational solar portfolio has increased to 6,243 MW, and the total operational renewable generation capacity to 9,784 MW, the largest in India, the statement added.

The 180-MW solar plant in Rajasthan will produce approximately 540 million electricity units annually, powering over 1.1 lakh homes and reducing around 0.39 million tonnes of CO2 emissions.

Next-generation bifacial solar PV modules and horizontal single-axis solar trackers (HSAT) have been deployed to maximise generation through better efficiency of modules and tracking the sun throughout the day.

The plant is equipped with waterless robotic module cleaning systems, enabling water conservation in the barren region of Jaisalmer. The Energy Network Operation Centre (ENOC), anchored in the secured digital cloud platform, enables real-time monitoring of AGEL’s renewable energy assets, leading to enhanced operational performance.

Anand Gupta Editor - EQ Int'l Media Network