Additional work requirements for connecting Solar Power Plants to the Grid Power supply
9
0
Additional work requirements for connecting Solar Power Plants to the Grid Power supply
For more information please see below link:
Related posts:
- Installation (Retrofit), Dismantling, Testing, Commissioning, Repair and Maintenance of LED Street Lights/LED Flood Lights for period of 7 years in 141 ULB’s of Bihar.
- S/I OF 15 W SOLAR LED STREET LIGHT AT 50 D/F PLACES IN PARLIAMENTARY CONSTITUENCY OF JALAUN GARAUTHA BHOGNIPUR, U.P.
- Providing Solar Street Lights at Mahakali Gumfa Road, Sher A Punjab Colony near Gurudwara Garden, Andheri east , Mumbai
- Assam Issues Tender for 8 MW Solar Power Projects for Residential consumers_Subsidised segment