1. Home
  2. India
  3. Amendment in the Guidelines for implementation of a scheme for setting – up of over 5000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding (VGF)
Amendment in the Guidelines for implementation of a scheme for setting – up of over 5000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding (VGF)

Amendment in the Guidelines for implementation of a scheme for setting – up of over 5000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding (VGF)

31
0

Amendment in the Guidelines for implementation of a scheme for setting – up of over 5000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding (VGF) under Batch-IV of Phase II of the NSM – reg.

For more information please see below link:

Source: mnre.gov.in
Anand Gupta Editor - EQ Int'l Media Network

LEAVE YOUR COMMENT

Your email address will not be published. Required fields are marked *