
Amendment in the Guidelines for implementation of a scheme for setting up of over 5,000 W Grid-Connected Solar PV Power Projects with Viability Gap Funding (VGF) under Batch-IV of Phase II of the JNNSM – reg.
205
0
Amendment in the Guidelines for implementation of a scheme for setting up of over 5,000 W Grid-Connected Solar PV Power Projects with Viability Gap Funding (VGF) under Batch-IV of Phase II of the JNNSM – reg.
For more information please see below link:
Related posts:
- Chinese move may pull down solar bid tariffs further
- Amazon joins Walmart in blaming Tesla solar panels for fires
- MSEDCL seeking approval for adoption of tariff for long term procurement of 7 MW wind power from the Wind Generators
- MYSUN plans Rs 600 crore investment to develop 200MW solar portfolio in next 3 years