![Amendment Scheme for over 5000MW Grid Connected SPV Power Projects with VGF under JNNSM](https://www.eqmagpro.com/wp-content/uploads/2018/06/Clarification-on-requirement-of-mandatory-registration-with-the-State-Renewable-Energy-RE-Nodal-Agencies-Sate-Nodal-Agencies-SNA-for-implementation-of-RE-power-projects-reg..jpg)
Amendment Scheme for over 5000MW Grid Connected SPV Power Projects with VGF under JNNSM
60
0
Amendment Scheme for over 5000MW Grid Connected SPV Power Projects with VGF under JNNSM
For more information please see below link:
Related posts:
- Climate change: An ‘existential threat’ to humanity, UN chief warns global summit
- Tender Results : 200MW Solar PV Project in Pavagada Solar Park Karnataka
- Tata Power ties up with NTT Com-Netmagic to set up 50 MW solar project
- Will meet our goal of 175 GW of renewable energy well before target of 2022