![Application for adoption of Transmission Charges with respect to the Transmission System being established by Bikaner-Khetri Transmission Limited](https://www.eqmagpro.com/wp-content/uploads/2019/11/Application-for-adoption-of-Transmission-Charges-with-respect-to-the-Transmission-System-being-established-by-Bikaner-Khetri-Transmission-Limited.jpg)
Application for adoption of Transmission Charges with respect to the Transmission System being established by Bikaner-Khetri Transmission Limited
0
0
Application under Section 63 of the Electricity Act, 2003 for adoption of Transmission Charges with respect to the Transmission System being established by Bikaner-Khetri Transmission Limited
For more information please see below link:
Related posts:
- Regarding exemption of construction phase bank guarantee for an applicant who fulfils the exemption eligibility criteria post-submission of LTA application
- Application for Adoption of Transmission Charges
- In the matter of: Application for recoupment of under-recovered energy charges due to shortfall in energy generation
- Petition for Adoption of Tariff for 2000 MW of ISTS Solar Projects
tags:
ACME Solar ACME Solar Holdings Limited CENTRAL ELECTRICITY REGULATORY COMMISSION Power Company of Karnataka Limited Powergrid Khetri Transco Limited Udupi Kasargode Transmission Limited