APPOINTMENT OF CONSULTANT FOR CONDUCTING LEGAL DUE DILIGENCE OF THE LAND FOR SOLAR PV PROJECTS IN CPSU SCHEME PHASE II TRANCHE I
0
0
APPOINTMENT OF CONSULTANT FOR CONDUCTING LEGAL DUE DILIGENCE OF THE LAND FOR SOLAR PV PROJECTS IN CPSU SCHEME PHASE II TRANCHE I
For more information please see below link:
Related posts:
- Annual Maintenance Contract of Scada of solar roof panel including spares at NTPC
- Supply of Grid Connected 30 kWp BIPV Solar Roof Top on VIP Guest House of NTPC Koldam
- PROCUREMENT OF 6 SQ MM DC POWER CABLE FOR 15 MW SOLAR POWER PLANT INSTALLED AT JAYANT SINGRAULI
- Conducting Topographical survey in ash dyke solar area at NTPC Solapur
tags:
NTPC Limited