![At Rs 8.34 crore a MW, putting up coal-fired power plants is a costly affair: Power Ministry Report – EQ Mag](https://www.eqmagpro.com/wp-content/uploads/2022/12/Coal-remains-largest-source-of-carbon-dioxide-emissions-IEA-says.jpg)
At Rs 8.34 crore a MW, putting up coal-fired power plants is a costly affair: Power Ministry Report – EQ Mag
0
0
The Report on Optimal Generation Capacity Mix for 2029-30, released by the Ministry last week, also says that between now and 2030, India will build 26,900 MW of coal power plants
Putting up a new coal-fired thermal power plant will cost ₹8.34 crore a MW, says a recent Power Ministry Report. The figure has been arrived at “as per the latest inputs provided by various manufacturers/developers,” the report says.