BHEL secures order for 2×660 MW Talcher Thermal Power Project Stage-III – EQ Mag Pro
0
0
New Delhi: BHEL has received a prestigious order for setting up the 2×660 MW Talcher Thermal Power Project Stage-III on EPC (Engineering, Procurement & Construction) basis from NTPC Ltd.
NTPC is investing Rs 11,843.75 crore for this 1,320 MW Talcher Thermal Power Project, Stage-III.
Source: psuconnect
Related posts:
- INNOVATION: BHEL demonstrates tech to create methanol from coal – EQ Mag Pro
- BHEL commissions India’s largest floating Solar PV plant Major milestone towards self-reliance in floating solar technology – EQ Mag Pro
- Chandigarh holds on to the dream of becoming a solar city
- Marines shut off power, run base with renewable energy