Case of Brihanmumbai Electric Supply and Transport Undertaking in the matter of State Transmission Utility’s to submit the proposal for Extension of PPA from embedded generation – EQ Mag Pro
0
0
Case of Brihanmumbai Electric Supply and Transport Undertaking in the matter of State Transmission Utility’s to submit the proposal for Extension of PPA from embedded generation.
For more information please see below link:
Related posts:
- MERC Rules in Favor of Avaada Energy for Delay in Signing PPA
- Petition Has Been Filed By Tata Power Renewable Energy challenges the legality and validity of Order passed by MERC – EQ Mag Pro
- Petition of M/s. Tata Power Renewable Energy Limited for approval of the cost incurred due to change in the rate of Basic Custom Duty from 5% to 20% – EQ Mag Pro
- Case of Nidar Utilities Panvel LLP for approval of PPA and Adoption of Tariff determined through transparent bidding process for a Short-Term procurement of power up to 3 MW – EQ Mag Pro