1. Home
  2. Policy & Regulation
  3. Case of Minex Metallurgical Pvt. Ltd. for non levy of transmission charges for wheeling of power under Open Access from its Wind Generator injected at 33kV and drawn at 11kV – EQ Mag Pro
Case of Minex Metallurgical Pvt. Ltd. for non levy of transmission charges for wheeling of power under Open Access from its Wind Generator injected at 33kV and drawn at 11kV – EQ Mag Pro

Case of Minex Metallurgical Pvt. Ltd. for non levy of transmission charges for wheeling of power under Open Access from its Wind Generator injected at 33kV and drawn at 11kV – EQ Mag Pro

0
0
Anand Gupta Editor - EQ Int'l Media Network