CEL Floats Tender For Supply Of BOS for Stand alone Off Grid SPV Water Pumping Systems in Madhya Pradesh
0
0
Rate Contract for Design Manufacture Supply Erection Testing and Commissioning of BOS for Stand alone Off Grid SPV Water Pumping Systems in Madhya Pradesh basis including complete system warranty and O&M for 5 Years under MNRE off grid and decentralised
For more information please see below link:
Related posts:
- RFP for Selection of Developers for Implementation of 100 MW Solar based power plants
- Supply of 45 MW of Grid Connected Solar PV Power Plants in Madhya Pradesh i.e. Lot I, II, III for Indore, Bhopal, Jabalpur
- OREDA Floats Tender for 1.47 MW of Rooftop Solar System in Odisha
- Development of Transmission System for 1500 MW Solar parks in Madhya Pradesh