Clarification No.1 to Tender Document for Design, Engineering, Manufacture, Supply, Storage, Civil Work, Erection, Testing & Commissioning of 5.76 MWp (DC) Grid connected Rooftop solar PV Plant including O&M of the Plant for a period of 5 years
70
0
Clarification No.1 to Tender Document for Design, Engineering, Manufacture, Supply, Storage, Civil Work, Erection, Testing & Commissioning of 5.76 MWp (DC) Grid connected Rooftop solar PV Plant including O&M of the Plant for a period of 5 years….