Construction of 33kV S/C transmission line to evacuate power from proposed 1 X 10MW solar PV Power Project at Chandapur village in Shiggaon Taluk (Under JNNSM Ph-2 Batch-3 Tranch-5 scheme of M/s SECI New Delhi) to existing 110/33kV KPTCL sub-Station Shiggaon
54
0
Construction of 33kV S/C transmission line to evacuate power from proposed 1 X 10MW solar PV Power Project at Chandapur village in Shiggaon Taluk (Under JNNSM Ph-2 Batch-3 Tranch-5 scheme of M/s SECI New Delhi) to existing 110/33kV KPTCL sub-Station Shiggaon….
For more information please see above link: