CREDA invites EOI for Preparation of DPR for Development of Solar Parks of 500 MW in Chhattisgarh
176
0
CREDA has advertised EOI (No: 20458) dated 03.03.2016 for Preparation of DPR, for Development of Solar Parks of 500 MW Capacity. EOI Document is available on
http://www.creda.in/eoi-preparation-detailed-project-report-development-500mw-solar-parks.
Related posts:
- Construction of Passenger Shed and Provision of Solar Light at Kandarvan Tal and Dist. Palghar
- Supply of Solar Panel Based Inverter
- Rfp For Procurement of 1000 MW Power From Grid Connect Solar PV Power Projects Through Tariff Based Competitive Bidding Process
- PROVIDING ROOF TOP SOLAR PLANT AT CHENNAI BASED LOCATIONS