1. Home
  2. Tenders
  3. Design, Engineering, Supply, Construction, Erection, Testing, Commissioning and Warranty of Thirteen months of Sub-Stations –Power Evacuation of Solar Power Plants
Design, Engineering, Supply, Construction, Erection, Testing, Commissioning and Warranty of Thirteen months of Sub-Stations –Power Evacuation of Solar Power Plants

Design, Engineering, Supply, Construction, Erection, Testing, Commissioning and Warranty of Thirteen months of Sub-Stations –Power Evacuation of Solar Power Plants

24
0

Design, Engineering, Supply, Construction, Erection, Testing, Commissioning and Warranty of Thirteen months of Sub-Stations –Power Evacuation of Solar Power Plants- ranging from 630 KVA, 750 KVA, 1 MVA and 1.2 MVA, 1.5 MVA at Nashik district

For more information please see below link:

Anand Gupta Editor - EQ Int'l Media Network

LEAVE YOUR COMMENT

Your email address will not be published. Required fields are marked *