Design, Preparation of detailed drawing, Supply, Installation, Testing, Commissioning TAC / Statutory bodys approval of Fire Fighting, Sprinkler, FDA system as per technical specification, drawing and Schedule of rates given in the NIT, complete in all respect in Connection with the Project Construction of Solar Dome at Eco-Park, Newtown, Kolkata, West Bengal
21
0
Design, Preparation of detailed drawing, Supply, Installation, Testing, Commissioning TAC / Statutory bodys approval of Fire Fighting, Sprinkler, FDA system as per technical specification, drawing and Schedule of rates given in the NIT, complete in all respect in Connection with the Project Construction of Solar Dome at Eco-Park, Newtown, Kolkata, West Bengal
For more information please see below link:
Related posts:
- DESIGN, FABRICATION, SUPPLY, INSTALLATION, TESTING, COMMISIONING AND OPERATION, MAINTENANCE FOR A PERIOD OF 5 YEARS, OF TOTAL 50 KW CAPACITY GRID-CONNECTED SOLAR PV POWER PLANT UNDER ROOF-TOP NET METERING ALONG WITH SUPPLY, ERECTION, TESTING AND COM
- DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING, COMMISSIONING OF 83 kW GRID CONNECTED SOLAR PV POWER SYSTEMS
- DESIGN, FABRICATION, SUPPLY, INSTALLATION, TESTING, COMMISIONING AND OPERATION A MAINTENANCE FOR A PERIOD OF 5 YEARS, OF TOTAL 10 KW CAPACITY
- Design, Supply, Installation, Testing, Commissioning and Warranty for 5 years of 300 KWp Solar Photovoltaic Grid Connected Ground Mounted Power Plant at CEL Campus, Sahibabad
tags:
Commissioning TAC / Statutory bodys approval of Fire Fighting complete in all respect in Connection with the Project Construction of Solar Dome at Eco-Park Design drawing and Schedule of rates given in the NIT FDA system as per technical specification INSTALLATION Kolkata Newtown Preparation of detailed drawing Sprinkler Supply Testing West Bengal