Design, Supply, installation and commissioning of grid – connected rooftop Solar Photovoltaic Projects in Chhatisgarh State Under RESCO mode vide notification no. 2402/27.04.18
97
0
Design, Supply, installation and commissioning of grid – connected rooftop Solar Photovoltaic Projects in Chhatisgarh State Under RESCO mode vide notification no. 2402/27.04.18
For more information please see below link:
Related posts:
- Design, Supply, Installation & Commissionning of 800KWp Solar roof top system in NTPC Darlipali
- Design, Development, Supply, installation and commissioning of Ignitability tests facilities for Solar PV Module as per IEC 61730-2:2016 (MST 24) at National Institute of Solar Energy, Gurugram, Haryana -122003, India
- Design, Engineering, Manufacture, Supply, Storage, Civil work, Erection of Suitable Structure, Testing & Commissioning of Roof Top Solar PV Project Including Operation and Comprehensive Maintenance ( O & M) of the Project in RESCO Model for a period of 25 Years at station/site of Mumbai Metro Rail Project for Line 7& 2A Totalling around 7.63 MWp
- Design, Supply, Installation and Commissionning of 800KWp Solar roof top system in NTPC Darlipali
tags:
Design installation and commissioning of grid - connected rooftop Solar Photovoltaic Projects in Chhatisgarh State Under RESCO mode vide notification no. 2402/27.04.18 Supply