Design, Supply, Installation, testing and Commissioning of 30 kWp Grid Connected Roof Top Solar PV System at Barabazar HPO, Kolkata
41
0
Design, Supply, Installation, testing and Commissioning of 30 kWp Grid Connected Roof Top Solar PV System at Barabazar HPO, Kolkata
For more information please see below link:
Related posts:
- Design, Preparation of detailed drawing, Supply, Installation, Testing, Commissioning TAC / Statutory bodys approval of Fire Fighting, Sprinkler, FDA system as per technical specification, drawing and Schedule of rates given in the NIT, complete in all respect in Connection with the Project Construction of Solar Dome at Eco-Park, Newtown, Kolkata, West Bengal
- DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 100 kW, 15 kW and 15 kW (CUMULATIVE 130 kW) CAPACITY GRID CONNECTED ROOF TOP SOLAR POWER PLANTS WITH FIVE YEARS COMPREHENSIVE MAINTENANCE CONTRACT AT Z.P.MAIN BUILDING, NORTH S
- DESIGN, FABRICATION, SUPPLY,INSTALLATION, TESTING, COMMISIONING AND OPERATION AND MAINTENANCE CONTRACT OF 3 NOS. OF SOLAR SYSTEM On SCHOOL ANGANWADI UNDER VSTF AND 14 FINANCE COMISSION WITH 5 YEAR COMPREHENSIVE MAINTANANCE CONTRACT AT TAKLIVIRO
- DESIGN, FABRICATION, SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND OPERATION AND MAINTENANCE FOR A PERIOD OF 5 YEARS, OF TOTAL 24 KWp CAPACITY SOLAR PV POWER PLANT AT VARIOUS LOCATIONS IN 4 VILLAGES OF CHANDRAPUR DISTRICT
tags:
Design INSTALLATION Kolkata Supply testing and Commissioning of 30 kWp Grid Connected Roof Top Solar PV System at Barabazar HPO