Design, Supply, Installation, Testing, Commissioning and Warranty for 5 years of 300 KWp Solar Photovoltaic Grid Connected Ground Mounted Power Plant at CEL Campus, Sahibabad
45
0
Design, Supply, Installation, Testing, Commissioning and Warranty for 5 years of 300 KWp Solar Photovoltaic Grid Connected Ground Mounted Power Plant at CEL Campus, Sahibabad
For more information please see below link:
Related posts:
- DESIGN, FABRICATION, SUPPLY, INSTALLATION, TESTING, COMMISIONING AND OPERATION, MAINTENANCE FOR A PERIOD OF 5 YEARS, OF TOTAL 50 KW CAPACITY GRID-CONNECTED SOLAR PV POWER PLANT UNDER ROOF-TOP NET METERING ALONG WITH SUPPLY, ERECTION, TESTING AND COM
- DESIGN, FABRICATION, SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND OPERATION AND MAINTENANCE FOR A PERIOD OF 5 YEARS, OF TOTAL 24 KWp CAPACITY SOLAR PV POWER PLANT AT VARIOUS LOCATIONS IN 4 VILLAGES OF CHANDRAPUR DISTRICT
- SURVEY, DESIGN, FABRICATION, SUPPLY, INSTALLATION, TESTING, COMMISSIONING OF AC DC SOLAR PHOTOVOLATIC WATER PUMPING SYSTEMS OF 3 5 HP CAPACITY
- DESIGN, FABRICATION, SUPPLY, INSTALLATION, TESTING, COMMISSIONING WITH RMS FOR CUMULATIVE TOTAL 398 KW CAPACITY GRID-CONNECTED SOLAR PV POWER PLANT
tags:
CEL Commissioning and Warranty for 5 years of 300 KWp Solar Photovoltaic Grid Connected Ground Mounted Power Plant at CEL Campus Council of Scientific and Industrial Research Design INSTALLATION Sahibabad Supply Testing