DESIGN, SUPPLY, INSTALLATION, TESTING COMMISSIONING OF HVAC SYSTEM LIKE AIR CONDITIONING SYSTEM, VENTILATION SYSTEM, ELECTRICAL ITEMS, CONTROL INDICATION SYSTEM FOR SOLAR DOME PROJECT AT ECO PARK, NEW TOWN KOLKATA”
136
0
Online SINGLE PERCENTAGE RATE Offer(s) in two part system are invited from reputed, resourceful and experienced parties meeting prescribed qualifying criteria for DESIGN, SUPPLY, INSTALLATION, TESTING COMMISSIONING OF HVAC SYSTEM LIKE AIR CONDITIONING SYSTEM, VENTILATION SYSTEM, ELECTRICAL ITEMS, CONTROL INDICATION SYSTEM FOR SOLAR DOME PROJECT AT ECO PARK, NEW TOWN KOLKATA”
For more information please see below link:
Related posts:
- SOLAR DOME PROJECT AT ECO PARK, NEW TOWN KOLKATA
- DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 100 kW, 15 kW and 15 kW (CUMULATIVE 130 kW) CAPACITY GRID CONNECTED ROOF TOP SOLAR POWER PLANTS WITH FIVE YEARS COMPREHENSIVE MAINTENANCE CONTRACT AT Z.P.MAIN BUILDING, NORTH S
- DESIGN, FABRICATION, SUPPLY,INSTALLATION, TESTING, COMMISIONING AND OPERATION AND MAINTENANCE CONTRACT OF 3 NOS. OF SOLAR SYSTEM On SCHOOL ANGANWADI UNDER VSTF AND 14 FINANCE COMISSION WITH 5 YEAR COMPREHENSIVE MAINTANANCE CONTRACT AT TAKLIVIRO
- Design, Supply, Installation, Testing and commissioning of 8 MW Ground Mounted Grid connected PV Solar Plant at Hubballi Airport.
tags:
CONTROL INDICATION SYSTEM FOR SOLAR DOME PROJECT AT ECO PARK Design ELECTRICAL ITEMS INSTALLATION NEW TOWN KOLKATA" Supply TESTING COMMISSIONING OF HVAC SYSTEM LIKE AIR CONDITIONING SYSTEM VENTILATION SYSTEM