Determination of project specific levelized tariff 2×10 MW (AC) NLCIL solar PV power project with 8MWhr BESS (battery energy storage system) – EQ
0
0
Determination of project specific levelized tariff 2×10 MW (AC) NLCIL solar PV power project with 8MWhr BESS (battery energy storage system).
For more information please see below link:
Related posts:
- Refund of Differential Amounts of RECs as per directions of Hon’ble Supreme Court of India in Civil Appeal – EQ Mag Pro
- Petition for approval of input price of coal supplied from Pakri Barwadih mine – EQ Mag Pro
- Petition for revision of tariff for the 2014-19 tariff period in respect of Koteshwar Hydro Power Station (400 MW) – EQ Mag Pro
- Petition for adoption of tariff for 1200 MW Wind-Solar Hybrid Power Projects (TRANCHE-IV) connected to the ISTS and selected through competitive bidding process – EQ Mag