Determination of tariff / Indicative tariff for the RE power projects, as per the eligibility criteria specified in HERC RE Regulations – EQ Mag Pro
0
0
Determination of tariff / Indicative tariff for the RE power projects, as per the eligibility criteria specified in HERC RE Regulations.
For more information please see below link:
Related posts:
- Filing of ARR Petition for FY 2022-23, APR for FY 2021-22, and True-up for FY 2020-21, under HERC Terms and Conditions – EQ Mag Pro
- Petition for grant of connectivity and open access for intra state transmission and distribution system Regulations, 2012
- HERC: Petition for approval of source and draft PPA to be executed with LR Energy
- IN THE MATTER OF: Petition for waiver of revision of ACD for FY 2019-20 & FY 2020-21 on the electricity consumers of DHBVN in Haryana – EQ Mag Pro