Dismantling & reinstallation of 85 KW solar plant of at IIT Indore
0
0
Dismantling(Removing), shifting, reinstallation, commissioning, and testing of 85 KW solar plant of SIC building to WTP and MRS building roof at IIT Indore
The last date to submit the bids is March 30, 2021
For more information please see below link:
Related posts:
- Provision Of Intelligent Solar Power System For Mt Pool, Ashoka Swimming Pool And Provision Of Bulk Meters At Ins Shivaji Lonavla
- Supply AND Installation of Solar System at GAIL,Vaghodia
- SUPPLY INSTALLATION OF 5 KW SOLAR POWER PLANT AT CHUBAKA POST
- PREQUALIFICATION AND PROCUREMENT OF 100 KWP SOLAR POWER PLANT